| Brand Name: | Tendars |
| Model Number: | TD-PMT-11 |
| MOQ: | 1 set |
| Price: | USD 25 - 95 per square meter |
| Packaging Details: | Frame in bundles by assembly order, fabric folded with interleaving, fittings in labelled crates |
| Payment Terms: | T/T 30% deposit, balance before shipment; L/C at sight |
At a gala, guests should not be able to see how the room was built. They should see light, drapery, table settings and each other. A luxury lined marquee hides the structure completely: the aluminum frame disappears behind pleated wall and roof linings, cables are routed inside the lining cavity, and lighting is integrated so that no fixture hangs from a visible beam.
Lining quality is measured in details that photographs reveal later. Pleats must be evenly spaced, seams must align with the room's symmetry, and the junction between wall and roof lining must be closed rather than gaping. Our linings are made to the frame's actual bay dimensions, with pleat spacing set at the design stage so the finished room looks intentional from every angle.
Key Features and Selling Points| Parameter | Specification |
|---|---|
| Lining | Pleated roof and wall lining, ivory or white |
| Cabling | Concealed routes inside lining cavity |
| Lighting | Uplighting, pin spot and chandelier positions |
| Detail | Coordinated entrance drape and stage skirt |
| Frame material | Hard-pressed extruded aluminum alloy 6061/T6, anodized finish |
| Frame profile series | 64 mm / 82 mm / 100 mm / 120 mm square profiles by span |
| Bay spacing | 3 m / 4 m / 5 m modular bays, extendable at any time |
| Eave height options | 2.5 m to 4 m clear height, higher on request |
| Roof fabric | 650 g / 750 g / 850 g per sqm double PVC-coated polyester, blackout available |
| Side wall options | Solid PVC, clear PVC, glass panel, mesh, glass door, ABS hard wall |
| Fire performance | Fabric meeting DIN 4102 B1 / EN 13501 B-s1,d0 on request |
| Wind load guidance | Engineered configuration by site exposure, documented operating limits |
| Snow load guidance | Steeper pitch and reduced purlin spacing for snow regions |
| Temperature range | -30 C to +70 C service range for fabric and frame |
| Design life | 15 years frame, 8 to 10 years fabric under normal use |
| Warranty | 5 years on aluminum frame structure, 2 years on PVC fabric |
All values are configuration dependent. Final specifications are confirmed on the approved drawing before production.
Configuration Guide for Croatian BuyersUse the table below to match the structure to your site exposure and event type. Our engineers confirm the final configuration against photographs of the ground, the prevailing wind direction and the event duration.
| Duty level | Typical use | Recommended build |
|---|---|---|
| Light duty | Garden parties, short events, sheltered inland sites | 64 mm profile, alternate bay bracing |
| Standard duty | Weddings, corporate functions, coastal towns in summer | 82 mm profile, cross-braced bays, mixed walls |
| Heavy duty | Exposed coast, island venues, public events, winter use | 100-120 mm profile, full bracing, engineered anchors |
This specification is used for gala dinners, award ceremonies, charity balls, diplomatic receptions, brand anniversaries and formal wedding banquets. Hotels in Zagreb, Opatija and Dubrovnik use lined marquees to extend ballroom capacity without losing the formal atmosphere guests expect. It also suits winter events, where the lining layer adds a small amount of insulation and reduces the visual coldness of an unlined roof.
Design Coordination Before the BuildThe most successful gala marquees are decided on paper, months before anything arrives on site. We ask for the table plan, the stage position, the entrance route and the lighting concept, then align the lining pleat pattern and the uplighter spacing with those decisions. When the room is designed as a whole, the tent stops looking like a tent.
We also recommend a lighting rehearsal in the evening before the event. Uplighters that look correct in daylight can produce hot spots on pleated fabric at night, and a one hour adjustment at that stage protects the entire evening's photography.
Why Croatian Event Buyers Work With TendarsEvery project starts with an engineering question rather than a catalogue page: what wind will this structure see, what ground will it stand on, and how long will it stay up. Our technical team reviews site photographs, exposure and event duration before a configuration is proposed, and the recommendation is issued as a drawing set that a venue manager or a safety officer can actually read.
The factory behind that advice is vertically integrated. Aluminum profiles are cut, machined and welded in house, PVC panels are welded on our own high-frequency lines, and every frame is trial assembled before it is packed. Because we control both the metal and the membrane, a buyer gets one supplier responsible for fit, tension and finish instead of two parties pointing at each other when a panel does not line up.
Documentation is part of the product. Shipments include shop drawings, the packing list matched to crate labels, an installation sequence and a maintenance sheet, and we retain the drawings so that repeat orders match the first delivery exactly. For public events, hotel terraces and protected sites we also prepare the fire performance and anchoring paperwork that local inspections typically request.
Notes for the Croatian MarketMost Croatian event enquiries arrive with three requirements: the structure must look right for a coastal or heritage setting, it must stand up to wind that arrives without warning, and it must be installed inside a tight access window. We address these in the quotation stage rather than after the order, which is why our proposals include anchoring options, installation crew guidance and a delivery sequence suited to ferry timetables and old town access restrictions.
Documentation matters too. Public events, hotel terraces and protected sites increasingly require fire performance evidence and a clear anchoring plan. We prepare those documents with the order so the organiser can answer a venue or an inspection without delay, and we keep the drawings on file for repeat orders so the second season is faster than the first. For gala dinners and award ceremonies, that translates into a specification we confirm on the drawing, a delivered price to the Croatian port and a build sequence the local crew can follow without supervision.
Frequently Asked QuestionsPacking follows the build sequence rather than the shape of the components: the frame and roof bundle that closes the structure against weather is loaded last so it can be unloaded first. Fabric panels travel folded with interleaving to prevent abrasion in transit, and fittings are boxed by assembly stage so nothing has to be sorted on site.
Each crate is weighed, labelled and photographed before loading, and the photographs are sent with the shipping documents. That record settles most transit questions quickly and tells the receiving crew exactly what should be on the pallet before they sign for it.
Request a QuotationSend us your site location, expected guest numbers, event dates and ground surface, and we will return a configuration proposal with anchoring options, installation guidance and a delivered price to your Croatian port or site. Samples of fabric and frame profiles can be couriered on request.
Email: amanda@marquees-tent.com | WhatsApp: +86-13640286461 | Web: http://www.marquees-tent.com