| Brand Name: | Tendars |
| Model Number: | TDP-CR08X16 |
| MOQ: | 48 square meters |
| Price: | USD 42-58 / Square Meter |
| Packaging Details: | Curved beams in timber cradles, roof in numbered bags per bay, gutters nested, hardware in one case |
| Payment Terms: | T/T 30% deposit, balance before shipment; L/C at sight above USD 30,000 |
The first size that reads as a building from a distance. 128 sqm, 25 to 26 guests, curved roof and no ridge beam crossing the room.
An 8m curved roof carries load along the arc into the eaves, so the frame is lighter than an A-frame of the same span and the inside has no ridge to hang under or walk around. For a reception with a long head table against one wall, that matters.
Area guide: 5 sqm per guest under 10m span. 128 sqm holds 25 to 26 guests at round tables with a dance floor and bar.
Water runs into gutters at both eaves instead of off the gables, so the entrance stays dry and the downpipes sit at the wall line - useful on a poolside site where you do not want a waterfall into the pool.
Frame. 122 x 68 x 3mm curved aluminium 6061/T6, galvanised connectors, 350 x 350mm base plates. 20+ years.
Covers. 850gsm PVC roof to DIN 4102 B1, 650gsm walls. Clear roof panels can be substituted along the crown on request.
Drainage. 150mm aluminium gutter each long side with a 75mm downpipe per bay. On a poolside site we route the outlets away from the deck.
| Item | Specification |
|---|---|
| Clear span / length | 8m / 16m in 8m bays |
| Eave / crown | 2.5m / 4.6m |
| Frame | 122 x 68 x 3mm curved aluminium 6061/T6 |
| Roof / walls | 850gsm / 650gsm PVC, DIN 4102 B1 |
| Drainage | 150mm gutter, 75mm downpipe per bay |
| Wind load | 0.35 kN/sqm |
| Frame life | 20+ years |
Anchoring. Decking and paving around a pool rarely allow drilling. Use 350 x 350mm plates with 60kg blocks per leg, and keep the blocks off the coping stones - they crack.
Salt air. Anodised frame and galvanised connectors handle coastal sites; the fabric is the part that ages fastest. Rinse the roof twice a season and it holds colour far longer.
Wind at the water. Open water gives a clean wind with no shelter. Add two guys per gable on any poolside install.
25 days production after deposit, plus freight to your port. Six people, about six hours. Installation is quoted separately: labour, air tickets, visa, food and accommodation are paid by the buyer. Send us the site address and we confirm crew size, days and cost.
Can it be open sided? Yes, and at 8m the curve looks best with two long walls open and the gables closed.
Does the curved roof collect water? No. Both curves fall to the gutters. The only trap is a blocked downpipe, so we fit a leaf guard.
Can we print branding on it? Yes, on the walls and on the gable panels. Full roof print on an 8m curve is possible but expensive.