| Brand Name: | Tendars |
| Model Number: | TDP-HP06X12 |
| MOQ: | 36 square meters |
| Price: | USD 40-54 / Square Meter |
| Packaging Details: | Frame bundle about 6.2m long, roof panels in two bags, walls numbered per bay, hardware carton |
| Payment Terms: | T/T 30% deposit, balance before shipment; L/C at sight above USD 30,000 |
Same footprint as the standard 6 x 12, but the roof goes up to 4.9m at the ridge instead of 4.1m. Guests notice the difference before they notice anything else.
A 35 degree pitch does two things a flat A-frame cannot. Snow slides off instead of loading the roof, and the interior gains volume above head height, so a warm evening does not turn the tent into a sauna.
Area guide: 5 sqm per guest under 10m span. 72 sqm holds 14 guests at tables with a dance floor.
This is the model we quote for anniversaries, renewal of vows and garden ceremonies - events where a photograph of the ceiling ends up in the album.
Frame. 84 x 48 x 3mm aluminium 6061/T6 with a steeper rafter set than the A-frame. Same 350 x 350mm base plates, same legs, so a client can convert an A-frame to high peak by swapping the roof rafters.
Covers. 850gsm roof to DIN 4102 B1, 650gsm walls. The steeper panels shed water faster, so gutters are optional at this span and standard from 8m.
Gable. The high peak gable is a triangle of fabric tensioned to the ridge. On shaped or decorative gables we add a 20mm frame edge so the line stays crisp.
| Item | Specification |
|---|---|
| Clear span / length | 6m / 12m in 6m bays |
| Eave / ridge | 2.5m / 4.9m, pitch about 35 degrees |
| Frame | 84 x 48 x 3mm aluminium 6061/T6 |
| Roof / walls | 850gsm / 650gsm PVC, DIN 4102 B1 |
| Snow load | 0.4 kN/sqm |
| Packed weight | About 258kg, 1.25 cubic metres |
| Frame life | 20+ years |
Lighting. String lights and paper lanterns hang between the ridge and the eave. On a 4.1m ridge you lose 80cm of hanging space and the lights sit in faces.
Heat. Hot air collects above 4m instead of at head height. With two open gable panels, a 72 sqm tent stays 3 to 4 C cooler than the A-frame version.
Snow. At 35 degrees, wet snow slides. On a shallow A-frame it sits and somebody has to go out with a broom.
25 days production after deposit, plus freight to your port. Four people, about four hours including the steeper roof. Installation is quoted separately: labour, air tickets, visa, food and accommodation are paid by the buyer. Send us the site address and we confirm crew size, days and cost.
Can we convert our A-frame? Yes, with a rafter set and a new roof. Legs, purlins and base plates carry over.
Does it leak at the ridge? No. The ridge is a welded cap over a tensioned seam, not a stitched join.
Is it harder to put up? Slightly. The roof panels are bigger and go on at 4.9m, so a ladder and two people on the roof line, not one.