| Brand Name: | Tendars |
| Model Number: | TDS-MG40X100 |
| MOQ: | 600 square meters |
| Price: | USD 58-82 / Square Meter |
| Packaging Details: | Mega beams on steel saddles in open top containers, fabric in 5m bay bags with lifting harnesses, foundation templates crated per column line |
| Payment Terms: | T/T 30% deposit, 60% before loading, 10% after structural sign off; L/C at sight |
Some jobs cannot be split. A relief centre needs one hall so a truck can turn inside. An arena needs 40m clear so the surface fits with runoff.
4000 sqm, 6m to the eave, 10.5m at the ridge, twenty bays, no internal column. The beam is a 300 x 120 x 5mm fabricated section in 6061/T6 - fabricated, not extruded, because no standard extrusion runs this deep with the wall thickness the span needs.
Area guide: 1.2 to 2 sqm per guest, so 2000 to 3300 people, or bulk storage and vehicle circulation instead.
This is not a stretched 30m. The foundations are a design, not a bag of stakes, and the anchor plan comes from the calculation rather than the catalogue.
Frame. 300 x 120 x 5mm fabricated aluminium 6061/T6 beam sets, 20 of them, each about 1.9 tonnes. Hot dip galvanised connectors, 350 x 350mm base plates on cast in anchors.
Covers. 900gsm PVC roof, hot air welded seams, flame retardant to DIN 4102 B1, 650gsm walls. Roof panels are pulled over in sections, never laid out flat in wind.
Foundation. 80 concrete pads, 600 x 600 x 800mm, M24 anchors cast in. Roughly 90 cubic metres of concrete and a week of groundwork before our crew arrives.
| Item | Specification |
|---|---|
| Clear span / length | 40m / 100m, 20 bays of 5m |
| Eave / ridge | 6.0m / 10.5m |
| Frame | 300 x 120 x 5mm fabricated aluminium 6061/T6 |
| Foundations | 80 concrete pads 600 x 600 x 800mm, M24 anchors |
| Drainage | 250mm gutter, 160mm downpipe every bay |
| Wind load | 0.6 kN/sqm, certified to site |
| Frame life | 20+ years |
Site location, ground condition, basic wind speed, and use with occupancy. From those we return beam and column utilisation, foundation reactions and an anchor layout. Coastal or snow sites change the section and the price - better now than after a storm. On sand or made ground we ask for a plate load test: 15mm of settlement at one corner cracks gutters and pulls seams.
25 days production after deposit and structural approval, plus freight. Two 25 tonne cranes on lift days, 16 workers, 12 to 16 days. Installation is quoted separately: labour, air tickets, visa, food and accommodation are paid by the buyer. Send us the site address and we confirm crew size, days and cost.
Can the whole gable open? No. 12m or 16m with a truss beam over it is standard. Beyond that the structure needs a different design.
Can it go on ballast? At this span, no. Ballast becomes a 300 tonne delivery and the settlement is unpredictable. Concrete pads are the honest answer.
How many containers? About 168 cubic metres and 62 tonnes - five 40HQ plus two 40OT for the beam sets.