| Brand Name: | Tendars |
| Model Number: | TDS-2S30X50 |
| MOQ: | 500 square meters |
| Price: | USD 105-148 / Square Meter of ground area |
| Packaging Details: | Heavy frame and steel deck in open top container with timber dunnage, fabric in numbered bags, stair modules crated by level |
| Payment Terms: | T/T 40% deposit, 50% before loading, 10% after site check; L/C at sight |
1500 sqm downstairs and 1500 sqm upstairs on the same plot. Built for car fairs, expo pavilions and site offices where land is expensive and the event is short.
The upper level is not a mezzanine hung from the roof. It is a steel deck on primary beams spanning the 5m grid, carried by columns sized for two floors plus the roof - roughly 4.5 times the vertical load of a single storey event tent column.
Area guide: 1.2 to 2 sqm per guest per level, so 750 to 1250 people per floor.
Most clients put heavy exhibits below - a truck, a machine, a boat - and take meetings and hospitality upstairs. The deck handles 250 kg/sqm, which is people and furniture, not a 4 tonne machine.
Frame. Columns and beams calculated for two floors and roof load, in the 259 x 113 x 5mm class and larger. Galvanised connectors, 350 x 350mm base plates. 20+ years.
Deck. Steel deck, 100mm insulation, 22mm plywood, finish floor on request. Live load 250 kg/sqm, 1 tonne point load on 300 x 300mm.
Covers. 900gsm PVC roof to DIN 4102 B1, 650gsm walls. Flame retardant lining and 30 minute stair partitions available.
| Item | Specification |
|---|---|
| Footprint | 30 x 50m, 1500 sqm per level |
| Heights | 4.0m ground eave, 3.0m upper headroom, 3.6m at crown |
| Frame | Engineered column section for both floors plus roof |
| Deck | Steel deck, 100mm insulation, 22mm plywood, 250 kg/sqm live load |
| Stairs | Two 1.2m flights, 45 degrees, guardrail with 100mm vertical infill |
| Foundations | Concrete pads 500 x 500 x 500mm with M20 anchors |
| Frame life | 20+ years |
A single storey tent on ballast is normal. A two storey structure on ballast is not something our engineer puts a stamp on. Columns land on concrete pads, or on an existing slab with chemical anchors at 300mm embedment, and we ask for soil bearing of at least 100 kPa.
Fire is a different question with two floors. B1 fabric, flame retardant lining and 30 minute stair partitions are usually required, plus detection on both levels. We supply the fabric certificates for the fire engineer's file; approval is the local authority's call.
25 days production after deposit and foundation drawing approval, plus freight. Eighteen workers, 15 to 18 days, with one crane day for the deck lift. Installation is quoted separately: labour, air tickets, visa, food and accommodation are paid by the buyer. Send us the site address and we confirm crew size, days and cost.
Can the upper floor take machinery? Not standard. 250 kg/sqm is for people and furniture. Tell us the machine weight and we design a local steel sub frame.
How long does it stand? Clients run these for two to five years. Re-tension fabric annually and inspect anchors after every storm season.
Is a lift possible? Yes, as an external shaft in the gable bay, quoted per project with the local lift supplier.